Arditi, D and Balci, G (2009) Managerial Competencies of Female and Male Construction Managers. Journal of Construction Engineering and Management, 135(11), 1275–8.

Cable, J K, Jaselskis, E J, Walters, R C, Li, L and Bauer, C R (2009) Stringless Portland Cement Concrete Paving. Journal of Construction Engineering and Management, 135(11), 1253–60.

Caerteling, J S, Halman, J I M, Song, M and Dorée, A G (2009) Impact of Government and Corporate Strategy on the Performance of Technology Projects in Road Construction. Journal of Construction Engineering and Management, 135(11), 1211–21.

Chan, A P C, Chan, D W M and Yeung, J F Y (2009) Overview of the Application of “Fuzzy Techniques” in Construction Management Research. Journal of Construction Engineering and Management, 135(11), 1241–52.

Chan, A P C, Lam, P T I, Chan, D W M, Cheung, E and Ke, Y (2009) Drivers for Adopting Public Private Partnerships—Empirical Comparison between China and Hong Kong Special Administrative Region. Journal of Construction Engineering and Management, 135(11), 1115–24.

Chen, C and Orr, R J (2009) Chinese Contractors in Africa: Home Government Support, Coordination Mechanisms, and Market Entry Strategies. Journal of Construction Engineering and Management, 135(11), 1201–10.

Chen, H L (2009) Model for Predicting Financial Performance of Development and Construction Corporations. Journal of Construction Engineering and Management, 135(11), 1190–200.

El-Rayes, K and Jun, D H (2009) Optimizing Resource Leveling in Construction Projects. Journal of Construction Engineering and Management, 135(11), 1172–80.

Goh, Y M and Chua, D K H (2009) Case-Based Reasoning for Construction Hazard Identification: Case Representation and Retrieval. Journal of Construction Engineering and Management, 135(11), 1181–9.

Gransberg, D D and Riemer, C (2009) Impact of Inaccurate Engineer’s Estimated Quantities on Unit Price Contracts. Journal of Construction Engineering and Management, 135(11), 1138–45.

Lee, H, Seo, J, Park, M, Ryu, H and Kwon, S (2009) Transaction-Cost-Based Selection of Appropriate General Contractor-Subcontractor Relationship Type. Journal of Construction Engineering and Management, 135(11), 1232–40.

Park, M, Ji, S, Lee, H and Kim, W (2009) Strategies for Design-Build in Korea Using System Dynamics Modeling. Journal of Construction Engineering and Management, 135(11), 1125–37.

Park, S H (2009) Whole Life Performance Assessment: Critical Success Factors. Journal of Construction Engineering and Management, 135(11), 1146–61.

Park, T, Kim, M K, Kim, C and Kim, H (2009) Interactive 3D CAD for Effective Derrick Crane Operation in a Cable-Stayed Bridge Construction. Journal of Construction Engineering and Management, 135(11), 1261–70.

San Cristóbal, J R (2009) Time, Cost, and Quality in a Road Building Project. Journal of Construction Engineering and Management, 135(11), 1271–4.

  • Type: Journal Article
  • Keywords: Time factors; Construction costs; Quality control; Highway and road construction;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000094
  • Abstract:
    Time, cost and quality are the three factors that play a significant role in the planning and controlling of construction projects. The main barriers for their achievement are the changes in the project environment necessitating cost, time, and quality trade-offs. Literature has mainly focused on analyzing time and cost with little or no reported research focusing on models for optimizing construction time, cost, and quality jointly. Government agencies have recently started using new types of contracting methods which have placed an increasing pressure on decision makers in the construction industry to search for an optimal/near optimal resource utilization plan that minimizes construction cost and time while maximizing its quality. In this paper, a 0-1 Integer Programming model which enables meeting quality output standards and time and budget objectives respectively is developed. The clever use of binary variables allows us to solve many interesting and difficult problems and our ability to model complex problems increases tremendously when we use binary variables. A version of the model to minimize time meeting quality and cost objectives is applied to a road building project. Two alternatives versions of the model which enable to minimize cost meeting quality and time and to maximize quality meeting time and cost, are shown in an Appendix.

Wethyavivorn, P, Charoenngam, C and Teerajetgul, W (2009) Strategic Assets Driving Organizational Capabilities of Thai Construction Firms. Journal of Construction Engineering and Management, 135(11), 1222–31.

Zahraie, B and Tavakolan, M (2009) Stochastic Time-Cost-Resource Utilization Optimization Using Nondominated Sorting Genetic Algorithm and Discrete Fuzzy Sets. Journal of Construction Engineering and Management, 135(11), 1162–71.